7272 Wisconsin Ave. Office Buildings

Project Details

Do you have questions about our services?

Contact us today and discuss how the “Scaffold Resource Difference” can work for you.

Project Description

As one of the largest hoist projects in the Baltimore, DC corridor, Scaffold Resource installed 6 hoist cars, 4 of which were 6000-pound dual hoists allowing multiple cars to operate on one mast. The remaining 2 cars were oversized 8000-pound 15’-6” cars necessary for the large curtain wall assemblies that were being installed on the building. Multiple cars were installed via tower crane down into the basement of the building. This challenging installation was necessary to access the flat plane of the building to provide a clean straight access to the 300-foot office tower for both the West and East Residential Towers. The hoists were built along with the general contractor in a 21-step process where our team mobilized 18 times after the initial installations to keep pace with the building.

scaffolding and hoist use at 7272 Wisconsin ave by Scaffold Resource

Related Projects

Historic Clock Tower renovation with scaffolding, hoisting and trash chute by Scaffold Resource

Historic Old Post Office and Clock Tower Redevelopment

We are thrilled to announce the grand opening of our new Resource HQ and Reach DMV facility!

  • Date: Friday, July 12, 2024
  • Time: 10:00 AM – 3:00PM EDT
  • Location: 4841 Walden Lane, Lanham MD 20706
Resource Cars and Coffee Event June 22, 2024
Join us for Cars and Coffee at Resource HQ. 
We welcome all makes and models!