Project Name

Mid-Hudson
Bridge

Furnish and install scaffold/containment structure for top half of 260′ tall suspension tower on bridge in Poughkeepsie, New York. Contractor work items included: lead paint abatement, blasting and painting.

Scaffold challenges included:

  • Design and installation of scaffold over active traffic
  • Design and installation of scaffold over roadway with a 40′ span
  • Design and installation of scaffold to withstand 100 mph wind gusts