Project Name

Ben Franklin Bridge

Furnish and install scaffold/containment structure for 367′ tall suspension tower on bridge connecting Philadelphia and New Jersey. Contractor work items included: lead paint abatement, blasting and painting.

Scaffold challenges included:

  • Design and installation of scaffold over active traffic
  • Design and installation of scaffold over roadway with a 85′ span
  • Design and installation of scaffold to withstand 100 mph wind gusts
  • Delivery of equipment via barge